TeleCloud

Cargando experiencia...

Choosing cables for structured cabling by price is the most expensive way to cable a plant. Cat6 where Cat6A was needed, or copper where fiber was the answer, gets discovered once the line is already running and the network does not have the headroom.

We supply the cable as part of the project, install it to TIA/EIA standards and certify every point with Fluke equipment. We do not sell boxes of cable: we deliver links that pass the test.

We work with Panduit, and with single-mode and multimode fiber, depending on what the design calls for.

What we use and when

Which structured cabling cables we use, and in which case

Cat6

For offices and administrative areas with short runs and low electrical noise. Sufficient for most workstations.

Cat6A

For the plant floor, high-density WiFi and links that are going to grow. Better shielding against interference from motors and drives.

Single-mode and multimode fiber

To link buildings, cross long warehouses or feed the backbone of the equipment room. Immune to electrical interference.

Conduit and protection

Cable tray, conduit and separation from power according to the environment. On a plant floor, unprotected cable is the first thing to fail.

Why we do not sell it loose

An uncertified cable is a gamble

The same reel of cable can give you a perfect link or an intermittent one. The difference is in the termination, the bend radius, the distance from power and the final certification.

That is why supply goes together with installation: every point is tested with Fluke and handed over documented. If it fails, it gets fixed before we close.

Cat6A
Copper for the plant floor
and Cat6 for the office
Fiber
Single-mode and multimode
backbone and between buildings
Fluke
Certification
of every installed point

Delivered projects

Links already running on our cable

Marelli

CAT6 Panduit cabling with FiberRunner solution.

KDDI Denso

CAT6A structured cabling.

Hitachi-Astemo

Pannet CAT6 cabling and electrical cabling.

Kautex

Panduit cabling.

In every project the category was decided by the environment and the network load, not by the cable budget.

Request a quote

Tell us what you are going to connect

An engineer reviews your case and gets back to you within 24 hours. No cost, no commitment.

By submitting you accept our privacy notice.